Over 1000' of New Trail at Town Lake Park

A state Adopt a Trail grant has funded over 1000' of new trail at Town Lake Park. It's also paying for 2 new benches, restoration of sections of the existing trail, and the installation of a gravel parking lot at the Diane Street entrance. The benches are being crafted now and the parking lot should be built by early spring if not sooner.
The trials opened up some beautiful sections of the park, cleared away some industrial strength poison ivy, and addressed some minor erosion problems.
New section of trail around the peninsula.
New section of trail around the lower lake.

Comments

Popular Posts